Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 21 results ...

Abdollahipour, S (2013) Multi-parameter bidding in highway construction and rehabilitation projects, Unpublished PhD Thesis, , Oklahoma State University.

Alroomi, A S (2013) Integrative framework for sustainable development of the cost estimating profession, Unpublished PhD Thesis, , Oklahoma State University.

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market, Unpublished PhD Thesis, , Oklahoma State University.

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates, Unpublished PhD Thesis, , Oklahoma State University.

  • Type: Thesis
  • Keywords: duration; construction project; pipeline; scheduling; construction team
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305086041
  • Abstract:
    Scope and Method of Study. The purpose of this research was to expand the capabilities of linear scheduling to account for varying production rates in pipeline construction when and where they occur. This new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR) had two objectives. The first of these objectives was to outline a framework to apply changes in production rates when and where they occur along the horizontal alignment of the project. The second objective was to illustrate the difficulty or ease of construction through the time-location chart. Findings and Conclusions. This research showed that the changes in production rates due to time and location can be modeled for use in predicting future construction projects. The model created for this purpose is the Linear Scheduling Model with Varying Production Rates. Using LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. The graphical format allows the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

Eldin, N N (1987) Methodology for project management control in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time, Unpublished PhD Thesis, , Oklahoma State University.

Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Johnson, L R (1969) A competitive strategy model for highway construction proposals, Unpublished PhD Thesis, , Oklahoma State University.

Karimi, B (2018) Evaluation of emissions reduction strategies for heavy duty diesel construction equipment, Unpublished PhD Thesis, , Oklahoma State University.

Kim, J (2022) A multimodal approach to improve fire safety on construction sites, Unpublished PhD Thesis, , Oklahoma State University.

King-Lewis, A (2020) Diversity and inclusion of women in the construction industry, Unpublished PhD Thesis, , Oklahoma State University.

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities, Unpublished PhD Thesis, , Oklahoma State University.

Lusby, A K (2003) The effect of increased public investment in transportation infrastructure on oklahoma's economic development, Unpublished PhD Thesis, , Oklahoma State University.

Miller, R H (1973) Life cycle system model for estimating construction equipment ownership costs, Unpublished PhD Thesis, , Oklahoma State University.

Rainer, R K (1968) Predicting productivity of one or two elevators for construction of high-rise buildings, Unpublished PhD Thesis, , Oklahoma State University.

Shararah, H H (1981) Evaluation of wall construction techniques based upon economical factors influencing labor and materials, Unpublished PhD Thesis, , Oklahoma State University.

Spencer, G R (1987) Integration of cost estimating with critical path scheduling, Unpublished PhD Thesis, , Oklahoma State University.

Syachrani, S (2010) Advanced sewer asset management using dynamic deterioration models, Unpublished PhD Thesis, , Oklahoma State University.

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation, Unpublished PhD Thesis, , Oklahoma State University.

Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry, Unpublished PhD Thesis, , Oklahoma State University.

Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction, Unpublished PhD Thesis, , Oklahoma State University.